Benefits of your SPC Program for Maximizing the 10 Keys 2017



Statistical Process Control charts have been called the Voice of the Process. Progressive manufacturers utilize control charts to "listen" to their processes so that potentially harmful changes will be quickly detected and rectified. However, not all SPC programs deliver to their highest capability as there are many elements to get right to achieve maximum utility.

Why should you Attend:

The webinar will provide a high level overview of Statistical Process Control. Ten important keys to maximize the benefits of SPC in any company are described in detail. The ten keys range from technical considerations to management practices. An understanding of these important factors will allow SPC to be implemented effectively so that the expected benefits may be realized.

Areas Covered in the Session:

  • The Purpose of SPC
  • Identifying Key Characteristics
  • Validating Measurement Systems
  • Selecting the Right Chart
  • Control Limits and Specification Limits
  • Effective Sampling Strategies
  • Adequate Sample Sizes
  • Automating SPC (Real Time)
  • Empowering Operators
  • Driving Process Improvement

Who Will Benefit:

The target audience includes personnel involved in process development, manufacturing, quality, program management, and business operations.

  • Quality & Process Engineers
  • Quality Technicians
  • SPC Supervisors
  • Production Supervisors
  • Personnel involved in process development and validation
  • Manufacturing/Operations Personnel
  • Process Improvement Personnel
  • Supplier Quality Personnel

Compliance4All DBA NetZealous,
Phone: +1-800-447-9407
Email: support@compliance4All.com

Speaker and Presenter Information

Steven Wachs

Principal Statistician, Integral Concepts, Inc
Steven Wachs has 25 years of wide-ranging industry experience in both technical and management positions. He has worked as a statistician at Ford Motor Company where he has extensive experience in the development of statistical models, reliability analysis, designed experimentation, and statistical process control. Mr. Wachs is currently a Principal Statistician at Integral Concepts, Inc. where he assists manufacturers in the application of statistical methods to reduce variation and improve quality and productivity.

Relevant Government Agencies

SPC Program


Event Type
Webcast


This event has no exhibitor/sponsor opportunities


When
Fri, Feb 10, 2017, 10:00am - 11:00am PT


Website
Click here to visit event website


Organizer
NetZealous - Compliance4All


Contact Event Organizer


Join the event conversation:
@Compliance4all
#Compliance4all


Return to search results